My neighbor gave me permission to build a new road down to another flat spot on his property. Unlike the first access road that I cleared out, there is no existing road down to this 2nd flat spot. Kakama, Messik, and I all went down with my truck, some tow straps, and mattocks to start building a new road. We've dug out about 20-30 feet by hand so far. Almost enough to safely get the truck down from the switchback. Once we get the first part of the road leveled out we'll be able to make the rest of the road by simply towing logs out of the way
This is the planned route for the new road. It's a little bit curved at the beginning to follow the natural slope of the hill, then it's pretty much a straight shot to the flat spot.